7/28/2023 0 Comments 7 steps of lock out tag out![]() These procedures will help to prevent injuries in the event there is a mechanical failure in the equipment. NOTE: Individuals such as faculty, staff and students working in lab and shop environments, must follow these Special Procedures. To avoid electrical risks and potential injuries read the Precautions below. EHS will determine all safety requirements have been evaluated, understood and successfully implemented.Īnswer - Yes! If you shut off electrical power by turning off a Disconnect Switch you may be at risk of an unexpected failure of the equipment such as electrical arcing that can produce explosive forces. Please contact us at (434.982.4911) when you complete the training to continue with an onsite consultation of your LOTO operations. ![]() EHS Electrical Safety staff is available to answer questions and facilitate with registering for this training. University Personnel who shut down hazardous electrical energy sources must also complete Electrical Safety training. UVA Facilities Management Occupational Health & Safety offers ongoing LOTO Safety training. Awareness will familiarize the affected operator(s) with the LOTO devices that will be in use such as padlocks and tags that the operator cannot compromise (remove) a lock or tag, and the operator cannot use the equipment until it has been cleared for use by the Authorized personnel. Personnel affected by Shut Downs because they are operators of the equipment/machinery or they must work in a controlled work area, must be made aware of the LOTO procedures that will be carried out by Authorized personnel. Personnel are Authorized and Qualified through training on LOTO regulatory requirements and LOTO procedures for the equipment or machinery they have been assigned to work on. capacitors and pressure in a line) must be accounted for.Īnswer - Yes! Only Authorized Personnel can Shut Down and lock out equipment powered by hazardous energy sources. The total shutdown and restraint of all hazardous energy sources including the safe release of stored hazardous energy (e.g. Examples of Lock Out Devices include: ball valve and gate valve lock outs, circuit breaker lockouts, plug and wall switch lock outs and pneumatic lock outs. Physical restraints (Lock Out Devices) can be put onto the Energy Isolation Device and secured with padlocks. These devices are usually put into the off position to shut down the hazardous energy source. Most equipment and machinery has an Energy Isolation Device. LOTO operations must be done on all equipment, machinery or system Shut Downs before Authorized Personnel can perform repairs or service. This documents the Authorized LOTO personnel and the date. LOTO also includes applying a Warning Tag on the physical restraint device. Detect any knowledge gap and take the appropriate electrical safety training course.Answer - LOTO (Lock Out Tag Out) is the physical restraint of all hazardous energy sources that supply power to a piece of equipment, machinery or system. Learn how to achieve the zero accident status with our electrical safety training. Operating more safely minimizes threats and increases uptime, therefore the risk of reputation damage is avoided. Thanks to our experts on functional safety, standards, and regulatory compliance, we ensure support throughout the safety lifecycle, wherever and whenever it’s needed. That’s why we want to engage our customers to join us in being S.A.F.E in their workplace with our electrical safety services. ![]() Making sure we are S.A.F.E is more than following a list of steps, is in our DNA. The S.A.F.E culture is also in our customer’s sites Those are steps that are not only recommended in the field while working with critical equipment, but this is also something we could do anytime, anywhere to make sure that what we are going to do we’ll do it in the safest way. So, S.A.F.E is the mantra that reminds us to stay always focus and alert going through these four important steps: We understand that achieving a safe environment depends on external factors but also on us as individuals. Then, the customer representative signs to confirm that all the steps have been followed. To protect ourselves and perform work in an Electrical safe condition, we must fully understand and follow all the steps of the LOTO process the seven steps of Lock Out Tag Out safety:įollowing all the steps is highly important at the end of the job Schneider Electrics’ person in charge sign off that steps from 1 to 7 are completed. That’s why, at Schneider Electric, Safety is our first priority, not only for our people in the field, but also for any of our workers and, of course, our customers. In Europe, we have more than 2400 Field Services Representatives working at customer’ site every day, that means they face hundreds of different situations that could include dangerous procedures.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |